SIP Halfway House Duluth MN
Location: Duluth, MN
Project Information
Project Type: | Commercial, Other Commercial |
---|---|
Manufacturer: | Energy Panel Structures |
Builder: | Max Gray Construction, Inc. |
Design Professional: | DSGW |
Year Built: | 2019 |
Performance
High Performance: | No |
---|---|
HERS/EUI Index Score: | |
ACH50 - Blower Test Results: | |
kBtu/sq.ft./year: | |
CO2 lbs./sq.ft./year: |
Describe the end use of the building: 40 bed treatment facility to help people affected by chemical dependency and alcoholism.
How did SIP construction help you get this job? With Winter build, having panels built in controlled environment helped greatly in construction and construction costs.
SIP wall thickness and core material: 6” EPS panels
SIP roof thickness and core material: 12” EPS panels (Entry vestibule roof only).
Did SIPs help save time, labor, construction costs, or energy? Durability with the efficiency of the SIP panels were the main reasons, factory-controlled environment made Winter construction simpler.
Describe the HVAC system used on the project: Two-stage gas-fired furnaces with 96.0% AFUE Rating.
Documents
- Building Plans: 01-SIP Halfway House Duluth MN Thunderbird-Wren_floor-plans-11x17.pdf
- Other: 01- SIP Halfway House Duluth MN Thunderbird-Wren_MGC.pdf