Cornerstone Retail Building

Tustin, CA

Participant Information:
Company Name: Premier Building Systems
Contact Name: Laurie A. Miller
35 Hugus Alley
Puyallup, WA  98375
Phone:253-846-6033
Email: laurie.miller@premiersips.com
Website: www.premiersips.com

 
Category:
Commercial/Industrial/Institutional Buildings over 10,000 sq. ft.

Project Name:
Cornerstone Retail Building
195 South C Street
Tustin, CA 92780

Date completed: 2020
 
Dimensions of building: 117' x 148' 3-Stories

Total sq. ft. of conditioned space: 47,116 sq.ft.

 
Buildt by:
Paden & Bletscher Construction
Rich Paden
7080 N Marks Ave
Fresno, CA  93711
Email: rickp@pbconstinc.com
Phone: 559-256-7111 x111

Panels Manufactured by: Premier Building Systems

Designed by:
McKently Malak Architects
Herb Horowitz
Phone: 626-538-8348
35 Hugus Alley
Pasadena, CA  91103

Describe the end use of the building:
Retail and other: 3-story office building w/ground floor retail and 2nd/3rd floor office spaces for the County of Tulare District Attorney's and Public Defenders offices.

How did SIP construction help you get this job?
SIPS was selected due to the aggressive construction schedule and high performance requirements

SIP wall thickness and core material: 6" EPS (18" mail base insulation applied) 27,600 s/f of panels
SIP roof thickness and core material: 10" EPS 15,632 s/f of panels
 
Describe the benefits of using SIPs on this project. Did SIPs help save time, labor, construction costs, or energy?
Reduced construction time and labor costs. SIPS were highly energy efficient and became an integral part of the wall and roof system.

Describe any innovative design elements or structural engineering involved:
We were able to use the SIP system for the shear rather than a moment frame system which allowed us to provide larger storefront openings at the ground level.

Please list any certifications the project received, such as ENERGY STAR, LEED, National Green Building Standard, WELL, Passive House, Green Globes or local green building programs:
Met T24 and Cal Green requirements

Describe the HVAC system used on the project:
Mixed between conventional packaged roof top units and split system units

Describe any other energy-saving materials used in the building envelope other than SIPs. List U-values of windows used and the U or R-value of any insulation materials:
The SIPS system became an integral part of the building's exterior envelope system; meeting T24 and Cal Green requirements

Were any solar panels installed on the project? If so, indicate the size of the system:
No solar panels were installed as part of the project. However, the roof system was designed for future installation of solar panels.

Click on a photo to enlarge.

Builder Information

Paden & Bletscher Construction
Rich Paden7080 N Marks Ave
Fresno, CA 93711

Phone: 559-256-7111 x111
Email: rickp@pbconstinc.com

Panels manufactured by Premier Building Systems.