Performing Arts SIP School Parker CO
Location: Parker, CO
Project Information
Project Type: | Public Works |
---|---|
Manufacturer: | Premier Building Systems |
Builder: | Built Construction |
Design Professional: | Hord-Coplan-Macht |
Year Built: | 2016 |
Performance
High Performance: | No |
---|---|
HERS/EUI Index Score: | |
ACH50 - Blower Test Results: | |
kBtu/sq.ft./year: | |
CO2 lbs./sq.ft./year: |
K-8 Charter school with 900 students focused on performing arts was built with SIPs due speed of construction. Project was designed with SIPs because it has a very short build time and project team needed most efficient building methods. Panels were delivered in June and school was opening for the school year at the beginning of September.
Documents
- Other: Farm-SIP-Shop-Cottonwood-MN-SIPA-Bldg-Excellence.pdf
- Other: Performing-Arts-SIP-School-Parker-CO-2017-SIPA-Application.pdf