Enjoy 50% off all items in the SIPA Store until January 15, 2025!
Shop Now

Dunn SIP House Sauk Centre MN

Location: Sauk Centre, MN

Project Information

Project Type: Residential, > 3,000 sq. ft.
Manufacturer: Extreme Panel Technologies
Builder: Aspen Building & Design LLC
Design Professional:
Year Built: 2015

Performance

High Performance: Yes
HERS/EUI Index Score: 39
ACH50 - Blower Test Results: 0.69
kBtu/sq.ft./year:
CO2 lbs./sq.ft./year:

Awards/Certifications: Building Excellence Awards

BEA: 2016 Single Family Homes OVer 3,000 Sq. Ft. Winner

Building with SIPs generated significantly less onsite construction waste while framing our home when compared to building a house using conventional framing especially since all of the window and door openings were precut at the factory. This left only minor trim work needing completion onsite. Building with SIPs did increase our material costs compared to conventional framing. However, we recouped a good portion of that cost through decreased labor costs. The exterior of our house was completely framed in 19 calendar days. This was significantly faster than if we had used conventional framing. Finally, due to the extremely tight envelope that SIPs give our house, we are enjoying very low heating and cooling bills. As utility costs rise, we will save thousands of dollars in monthly utility bills over the life of our home – thanks to our SIP panels

Documents

Affiliated Members


Back

SIPA Website Sponsors